Skip to main content
KINETIC CORE000
核心校准CALIBRATING
Atuple
中文
METHODOLOGY · 3 TOPOLOGIES + 5 PROFILES · 7-DAY POC + 04 PHASES

Field-Verified Delivery: Offline PoC, Gated Rollout, and Full Handover

Backed by three ready offline deployment packages (Topology A / B / C) and 5 standard Profiles, engagements start with the Phase 00 7-Day Air-Gapped Offline PoC inside your intranet, then advance through four gate-verified phases to production handover.

Phase 00 · Fast-Track Entry7-DAY AIR-GAPPED POC · 3 TOPOLOGIES & 5 PROFILES READY

7-Day Air-Gapped Offline PoC Sprint

All three offline deployment packages (Topology A / B / C) and 5 standard Profiles are ready for PoC and production transition. Before launching a four-week rollout, our FDE team verifies 15-minute offline bring-up, hot-mounted legacy adapters, Feishu/WeCom mobile sign-off, shadow-sandbox replay, and in-place hot license upgrade inside your intranet.

Request 7-Day PoC Pack
Day 1

15-Minute Isolated Intranet Bring-Up

Install the Topology A compact two-process offline package on an air-gapped host in 15 minutes under hardened OS constraints (no temp-directory exec dependency), and complete admin and baseline gate setup via the browser first-boot wizard.

  • Topology A / B / C offline packages and 5 standard Profiles ready, zero phone-home
  • Compliant with strict regulated host policies (no temp-dir exec)
  • 2-minute browser onboarding wizard for admin roles and baseline gates
Days 2–5

Hot-Mounted Legacy Data & Live Loop Verification

Without rebuilding the core foundation, FDEs hot-mount isolated field adapters over legacy REST/SOAP ERP endpoints to test pre-write 4-tier blast-radius diffs, Feishu/WeCom bounded mobile approvals, frozen receipts, and time-travel shadow-sandbox replays.

  • Zero-core-rebuild hot-mounted adapters for legacy REST / SOAP ERP data
  • Pre-write 4-tier blast-radius diff plus Feishu/WeCom mobile sign-off
  • Cross-channel atomic frozen receipts & zero-write shadow replay drills
Days 6–7

Joint Acceptance & Zero-Downtime Hot License Swap

Business, IT, and security teams verify locked-field tamper blocks, receipt integrity, and dual-layer reversal logs together. Upon sign-off, hot-swap the license in place to enter production and transition into Phases 01–04 under the selected Topology and Profile.

  • Joint review of locked-field blocks, frozen receipts, and ERP reversals
  • In-place zero-downtime hot license upgrade without reinstall or migration
  • Target Topology A / B / C, standard Profile, and 4-tier Mandate plan confirmed
PHASE 00 GATE CHECKPOINT

Gate 00: Live intranet records, mobile approval freezes, tamper blocks, and shadow-sandbox replay verified on customer hardware before hot-swapping into production.

HOT LICENSE SWAP & CONTINUITY

Zero-Downtime Hot License Swap & Perpetual Continuity: Once accepted, your PoC instance hot-swaps in place to a production license with zero reinstall or data migration. Maintenance expiry only raises renewal reminders and gates major upgrades; live workflows continue uninterrupted.

FOUR DELIVERY PRINCIPLES

01

Verify one real workflow offline in 7 days

Test live records, Feishu/WeCom mobile sign-off, and shadow-sandbox replay on your own disconnected hardware before committing to rollout.

02

Zero core rebuild on existing ledgers

Keep existing ERP, OA, and core ledgers intact by hot-mounting isolated field adapters over legacy REST/SOAP interfaces.

03

4-tier progressive Mandate & pre-launch drills

Step through Observe → Propose → Execute with Gate → Autonomous only after every policy lock passes shadow-sandbox stress drills.

04

In-place hot license swap & structured handover

Upgrade accepted PoC instances in place with zero downtime, backed by perpetual continuity guarantees and Gate 04 internal team handover.

EXECUTION CADENCE & GATE CHECKPOINTS

Four-Phase Controlled Production Rollout & Gates

Phase 01Week 1

Scoping, Mandate Tiering & Redline Inventory

Building on the 7-day offline PoC baseline, work with business, IT, and security leads to select the target Topology (A / B / C) and standard Profile, define 4-tier progressive Mandates, and lock mandatory approval redlines.

Stage Deliverables

  • Production loop specification, quantitative acceptance criteria, and versioned initial Mandate
  • 4-tier blast-radius thresholds, locked-field inventory, and multi-channel approval matrix
  • Target deployment topology (Topology A / B / C), 5-Profile selection, and legacy API audit
GATE CHECKPOINT

Gate 01: Business, IT, and security leads jointly sign off production scope, Mandate bounds, and acceptance criteria.

Phase 02Week 2

Private Rollout, Hot-Mounted Adapters & Drills

Deploy the selected Topology and Profile inside customer infrastructure with OIDC/LDAP federation, wire zero-core-rebuild REST/SOAP ERP adapters, Feishu/WeCom mobile approval cards, and dual-layer reversal safeguards.

Stage Deliverables

  • Hardened private environment with OIDC/LDAP federation and write-only zero-plaintext vault
  • Idempotent ERP write-back channels with pre-write diff and dual-layer reversal
  • Feishu/WeCom mobile cards, atomic frozen receipts, and tamper drill report
GATE CHECKPOINT

Gate 02: Locked-field tamper blocks, cross-channel atomic freeze receipts, and dual-layer reversal drills pass 100%.

Phase 03Weeks 3–4

Shadow-Sandbox Replay & Governed Pilot

Run deterministic time-travel replays in shadow sandboxes with zero external writes to calibrate anomaly accuracy and mobile approval latency, then advance from Propose to Execute with Gate.

Stage Deliverables

  • Time-travel shadow-replay consistency report and exception triage log
  • Approval latency, blast-radius interception, and frozen receipt audit sample
  • Hands-on control-plane training for frontline approvers and internal operators
GATE CHECKPOINT

Gate 03: Sustained governed pilot meets acceptance thresholds with formal business sign-off.

Phase 04Week 5+

Capability Handover & Multi-Unit Scaling

Transfer Mandate governance runbooks, isolated extension standards, and time-travel audit procedures to your internal team while planning the next wave of workflows and headless sub-products.

Stage Deliverables

  • Enterprise runbooks, Mandate change guide, and compliance audit checklist
  • Hot-mounted extension standards and multi-department rollout plan
  • Long-term commercial maintenance, signed offline upgrades, and support cadence
GATE CHECKPOINT

Gate 04: Internal team independently runs routine Mandate updates, shadow-replay drills, and audit reviews.

CAPABILITY HANDOVER

Internal Capability Handover

Delivery acceptance requires verifiable handover of daily operations, Mandate policy maintenance, and cross-unit replication procedures to your internal team.

HANDOVER 01

Independent Mandate & Gate Stewardship

Transfer complete 4-tier Mandate policies, permission boundaries, locked-field specifications, and approval tier runbooks to internal administrators and business owners.

HANDOVER 02

Shadow Replay & Safe Rollback Readiness

Verify private deployment monitoring, immutable receipt audits, time-travel shadow replay, and dual-layer reversal drills so internal operators handle exceptions autonomously.

HANDOVER 03

Hot-Mounted Extensions & Cross-Unit Scaling

Deliver zero-core-rebuild extension governance blueprints enabling your internal engineering and operational teams to expand across departments cleanly.

Start an Offline PoC or Rollout Assessment

Request ready Topology A / B / C offline packages and the 7-day PoC pack, book an expert scoping call, or test approval gates in the sandbox.